Article Safehaven Marine to build a second S.A.R. Interceptor 48 for the Faroe Islands Rescue Service
by Marine-Pilots.com - published on 16 June 2020
Safehaven Marine have signed contracts with the Faroe Islands Rescue Service for an Interceptor 48
‘self-righting’ S.A.R. (Search and Rescue craft.) This is the second S.A.R. Interceptor 48 we have
supplied to the Faroe Islands following ‘Sverri’ in 2013, which has worked very well in the
challenging North Atlantic seas they face off the Islands, with her crew being totally confident with
her seakeeping abilities, performance and reliability during rescue operations over the last 7 years.
Article HamiltonJet unveils Electro-Hybrid Drive (EHX)
by Marine-Pilots.com - published on 23 June 2020
HamiltonJet unveiled its new Electro-Hybrid Drive (EHX) system – innovative technology that offers all the advantages of electric drive with the full capabilities of diesel.
This unique system delivers lowers fossil fuel consumption (reduced further when dock charging, as infrastructure allows) combined with the speed, manoeuvrability, efficiency and safety waterjets are renowned for.
Article Delaware Pilots Order New Launch from Gladding-Hearn
published on 15 September 2022
The Pilots’ Association of the Bay and River Delaware have ordered another pilot boat from Gladding-Hearn Shipbuilding, Duclos Corporation. It’s the pilots’ association’s fourth Chesapeake Class launch and eleventh pilot boat built by the Somerset, Mass., shipyard since 1957. Delivery of the new pilot boat is scheduled for 2024.
Video SWATH vs. Mono Hull
published on 21 December 2019
Article New Volvo Penta D16 IMO III solution powers pilot boats
published on 15 November 2022
Article Armstrong Marine USA delivers Glacier bay Pilot Boat
by BRIX Marine - published on 13 November 2020
Video How Ship Anchor Works? - Procedure For Anchoring a Ship at Sea
published on 11 July 2020
#Anchor #shipanchor #windlass Anchoring is one of the very frequent operations onboard ships. A number of variables and external factors influence the duration and location of an anchoring operation. While the type of seabed is of utmost importance during anchoring, soft muddy grounds or clay bottoms are best preferred. It should be taken care that the anchoring bottom is free of power lines, submarine cables, pipelines or rocks. Various methods on anchoring include consideration of...