Pacific Warrior (ULOC)
LOA 360m. Draft 22.3 m. Displacement 430k
On October 11, 2018, the Kristin Alexis was performing fleeting work with a crew of six, including a captain, pilot, and four deckhands (two per shift), at the Cooper Consolidated fleeting facility at Convent located at mile 161.5. About 2300, the Cooper Consolidated dispatcher informed the Kristin Alexis captain that their next job was to move the derrick-type crane barge Mr Ervin upriver to the Cooper Consolidated fleeting facility in Darrow, located at mile 175.
Unissued / Unused material - River Thames, London. Various shots of a River Pilot on boat on the River Thames. The pilots are organising a group of tugs moving along the river. They are turning an large ship around in a wide part of the river. Shots of the pilot as he comes on board the ship 'Sugar Produce'. Over shoulder shots of River Pilot on boat coming towards large ship. He climbs up ladder onto ship. FILM ID:3298.03 A VIDEO FROM BRITISH PATHÉ. EXPLORE OUR ONLINE CHANNEL, BRITISH...
In July 2021 DACOMA launched a new EU project: AMCOSTAR. Amcostar is a Eurostars/Eureka Network funded Eurostars project on Adaptive Control of Airkeel vessel stabilizer systems. The consortium partners, DACOMA ApS in Svendborg (DK), Syddansk Universitet - University of Southern Denmark in Sønderborg (DK), and Automasjon & Data AS in Stavanger (NOR) and Tuco Marine ApS - ProZero Workboats (DK) in Faaborg, will optimize, test, and demonstrate an adaptively controlled Airkeel stabilizer on a...