Pacific Warrior (ULOC)
LOA 360m. Draft 22.3 m. Displacement 430k
Tag along as we journey through Suez Canal into Mediterranean Sea.
The ship is on a 77 days voyage from Asia to East Coast United States in which we've taken the Suez Canal route. By using Suez Canal instead of around cape of Africa, this will save more than 5000 miles of fuel and time.
The time-lapse was taken over 16 hours.
Spectacular (silent) film footage of the construction of the Panama Canal more than a century ago. The film shows the construction of the Miraflores and Gatun locks in detail as well as the digging of "The Culebra Cut" including steam trains, steam shovels and steam dredgers at work and scenes of the locks an the Canal in its first days op operation in 1914. Wikipedia: The Panama Canal (Spanish: Canal de Panamá) is an artificial 82 km (51 miles) waterway in Panama that connects the...
Time Lapse Video: An inbound LNG carrier arrives at the Port of Rotterdam. At sea, in the Eurogeul channel, two maritime pilots have joined the vessel. Between the breakwaters four harbour tugs (Smit Harbour Towage) make fast to assist her manoeuvre. In the Beerkanaal channel the LNG carrier is stopped and swung before entering the Nijlhaven harbour. While approaching LNG Jetty 1 the ship's mooring lines are taken ashore by mooringboats (Koninklijke Roeiers Vereeniging Eendracht).
Pilot...