Compmillennia LLC (Washington, North Carolina, U.S.A.) has delivered its Lightspeed® 41 (15.5-meter) Pilothouse catamaran, featuring strong but lightweight all-composite construction with a 42-knots achieved by twin 300-hp V8 Mercury Seapro outboard engines.
Gladding-Hearn Shipbuilding, Duclos Corporation, has taken an order from the St. Johns Bar Pilots for a high-speed launch, based on the successful 40’ Resilient Class pilot boat introduced in 2005. Delivery to the Florida-based pilots is scheduled for mid-2024.
The "Overall Plan for the Construction of Hainan Free Trade Port" announced on June 1 this year proposes to build the Hainan Free Trade Port into an important gateway for deepening the country's reform and opening-up policy.
What happens when GNSS fails? In maritime navigation, this isn’t a hypothetical scenario – it’s a growing risk. Spoofing, jamming, and GNSS outages are increasing, especially in the Baltic Sea region. A failure can cripple navigation systems – with potentially serious consequences.