Our RBC 1100 2OBD, indestructible, safe and fast......
Manufacturer of high speed HDPE work boats up to 12m.
Made in Holland, Built to last!
Since 1978 Lyman-Morse has built more than 110 vessels, ranging from aluminum workboats to high-end composite racing yachts and luxury power yachts. “Their experience with so many different building materials opens up a world of new possibilities for our vessels,” says Baltic Workboats’ CEO Margus Vanaselja.
Tuco Marine Group has added the new 9,3-meter P-top design to the ProZero series.. The low-weight, semi-open design results in a faster workboat that has a larger operational range and extended working time on sea. The P-top features a protective P-top console solution and flexible seating arrangements which can accommodate up to 12 passengers or a full deck cargo.
The pilot vessel is located in Denmark. Please contact us by mail, we´ll forward your inquiry to the seller: info@marine-pilots.com Disclaimer: Marine-Pilots.com is only an intermediary for the sale and is not responsible for the completeness and accuracy of the information provided by the customer or for any errors in publication. BUILD YEAR 2015 DIMENSIONS: Length, Overall: 12.0 m Beam Overall (with fender): 3.0 m Draft (full load, hull): 0.95 m Displacement (full load): 6.400 kg...
On December 1st 2019 Dublin Port received a delivery of a new Pilot Boat - DPC Tolka.
This 1,195 horsepower 17.1m Orc vessel with a 5.3m Beam & Range 150 can reach greater distances and will allow Dublin Port’s highly skilled marine pilots to board larger ships in all weathers.
DPC Tolka has allowed Dublin Port to upgrade equipment in line with customer investment in new ships and additional capacity on existing routes.
Designed by French Naval Architect Pantocarene for both fuel...
NTSB issued an investigation report on the contact of tow William C with a Rock Island railroad bridge protection cell, on Des Plaines River, in January 2020. The investigation established that high speed prevented the pilot to correct the tow’s position after completing the transit through the previous bridge.