These brave man now to bring the ships safe in Port of Rotterdam.
#scheepskijker_havefotografie #maritimepilots #portofrotterdam
PORT QASIM LİMANI PIL0T BOT PROJESİ / KARAÇİ - PAKİSTAN PORT QASIM PORT PILOT BOAT PROJECT / KARACHI - PAKISTAN PİLOT BOT AMBER / PB2000 GÖVDE TİPİ /HULL TYPE: TEK GÖVDELİ /MONO HULL TAM BOY /LOA :20,50 m GENİŞLİK /BEAM :5,50 m MAKSİMUM HIZ / MAX. SPEED :23 Deniz Mili / 23 kts İNŞA MALZEMESİ /BUILDING MATERIAL :Çelik / Steel SEVK SİSTEMİ /PROPULSION SYSTEM :Sabit Kanatlı Pervane / Fix Pitch Propulsion
Dublin Port Company has taken delivery of a new Pilot Boat, named DPC Dodder. The state-of-the art vessel, which represents a significant investment to support the critical service performed by the pilots and pilot boat crews, arrived in Dublin Port on St. Patrick’s Day having set sail from Great Yarmouth last month.
Designed by French Naval Architect Pantocarene for both fuel efficiency and performance in challenging weather conditions, DPC Dodder features the latest navigational and...
The crew from Rescue RS 172 in Norway at sea trial with Humphree interceptors in "Active" mode. Storm outside Hvaler, Norway.
”Our job is to be there for people at sea in any condition. No system can eliminate motions from a roaring North Sea, what Humphree does is to give us the best possible control of our workboats, a system that makes a real difference to get the job done.”
Knut Hveding, Manager New Builds
Norwegian Search and Rescue team
It has been 1 month since the 1st case of coronavirus in the country. All airports were shut down, and mandatory confinement was issued 10 days ago. Nevertheless, Maritime shipping must continue (except for tourist related). The means that us pilots must continue with our duties despite the risks involved with all the ships' crews arriving from different countries. So we need to take all safety measures possible.
This particular maneuver was unberthing a chemical tanker, in loaded...
Rostock; 02.05.2020: Actually, the special ship with the giant heavy-lift crane crane, which was designed for over 5,000 tons load capacity, was supposed to be delivered in the next few days. During final tests the crane broke off in the afternoon of May 2. Four people were injured in the accident. This is the second accident with Liebherr cranes this year in the Rostock overseas port. Already in February this year two cranes were reported to have fallen into the water during loading....