Her length overall (LOA) is 24 meters and her width is 12 meters.
Build by Abeking & Rasmussen, Germany
Vessel name: Polaris ; Year built: 2012 ; Flag: Netherlands ; Homeport: Rotterdam Length: 81.2m X 13.3m ; GRT: 2501 ; Callsign: PBZN ; MMSI:245142000 ; IMO: 9496915 Type: Special Vessel / Pilot Ship A "Pilot Ship / Pilot Vessel" is a "special type" of ship in which it accommodates a certain and limited Marine Pilots (Sea, River, Harbor Pilots), it also carries small boats/crafts that are used to tender services to and from the Pilot ship. In a Pilot Vessel, the Pilots can take their time...
Built in 1980, the Maguelonne pilot boat, historical ship of the pilots of Sète, is getting a new look and swapping its thermal engine for a 100% electric propulsion. It is within the framework of the Green Pilot project, led by the MGH company, supported by its partners, the Occitanie Region and the Port of Sète-Frontignan, and with the participation of the pilot stations of Sète and Marseille-Fos, that the e-Maguelonne is born.
The maritime pilots lead the ships to the entrance of the...
IMO: - Name: IRAGO 6 PILOT BOAT Vessel Type - Generic: Pilot Vessel Vessel Type - Detailed: Pilot Vessel Status: Active MMSI: 431006513 Call Sign: - Flag: Japan [JP] Gross Tonnage: - Summer DWT: - Length Overall x Breadth Extreme: 20 x 4 m Year Built: - Home Port: - https://www.marinetraffic.com/en/ais/details/ships/shipid:3504653/mmsi:431006513/imo:0/vessel:IRAGO_6_PILOT_BOAT
The pilot boat Lesath brings the harbor pilot to the Allegro. It was windy and the sea was rough, the conditions where not extremely, but the boarding is not whitout risk.
This video is created 2 days after storm Ciara in the Port of Rotterdam. This was also the first day that the containerterminals where open after the storm.
Shipspotting Rotterdam,
Enjoy
In my most recent article, I talked about how ports are currently faced with disruptive circumstances that severely impact the day-to-day port operations. The COVID-19 situation and blockage of the Suez Canal lead to increased operational uncertainty and a need for ports to endure the situation rather than planning the future.