Pacific Warrior (ULOC)
LOA 360m. Draft 22.3 m. Displacement 430k
On October 11, 2018, the Kristin Alexis was performing fleeting work with a crew of six, including a captain, pilot, and four deckhands (two per shift), at the Cooper Consolidated fleeting facility at Convent located at mile 161.5. About 2300, the Cooper Consolidated dispatcher informed the Kristin Alexis captain that their next job was to move the derrick-type crane barge Mr Ervin upriver to the Cooper Consolidated fleeting facility in Darrow, located at mile 175.
Time Lapse Video:The deep draught VLCC PISCES STAR is approaching the Port of Rotterdam, after navigating through the Eurogeul and Maasgeul deep water channels in the Southern North Sea. The VLCC is proceeding in Calandkanaal channel to her berth in the Petroleumharbour No. 5.
Before coming alongside the VLCC is stopped and swung in the channel. Four harbour tugs are made fast to assist the manoeuvring vessel. Mooringboats bring the VLCC's steel mooring wires ashore when she is coming...