Article The conditions for recruiting pilots for the Le Havre station are changing.
by Marine-Pilots.com - published on 1 January 2020
Article Wärtsilä simulator upgrade will enhance Le Havre pilot operations
by Marine-Pilots.com - published on 25 May 2020
The technology group Wärtsilä will supply a complete navigational simulator upgrade for the Le Havre pilot station in France. The intention is to provide the pilot station with a totally new simulator specifically adapted to the requirements of the pilots’ operations. The order with Wärtsilä was placed in February 2020.The new unique visualisation system to be supplied is based on 14 DP projectors, comprising seven main circular and seven ground projection systems. It features a panoramic 350-degree screen.
Video Pilot boat by Alumarine Shipyard
published on 16 January 2020
A new generation Pilot Boat ! - One of the first IPS propelled workboat - A service speed of 30 knots - A lightweight and solid construction in aluminium - Fast crew operations and low running costs The specifications of this boat have been carefully studied to optimise performance and reliability, while minimising running costs, especially fuel consumption. Both light and powerful, this new 12-metre craft is capable of rapid turnarounds at a service speed of 30 knots. More information on...
Article #DangerousLadders on Facebook
by Marine-Pilots.com - published on 10 September 2019
Article Best practice on rigging pilot ladders (UK MAIB)
published on 7 July 2022
Video Pilot Ladder on Ships- Correct rigging procedure 2020
published on 8 January 2021
Correct method of rigging pilot ladder explained.
As explained, a large number of reports related to the use of pilot ladders which are too long relative to the vessel’s draughts. As a result, the excessively long ladders require shortening up before being deployed for boarding pilots. In these cases, ship crew shortens the pilot ladders, using D-shackles to choke the side ropes at the required height along the ladder’s length. In this method, the D-shackle is first secured to a hard point...