Articles
Article New ProZero P-Top Model Launched
by Marine-Pilots.com - published on 30 April 2020
Tuco Marine Group has added the new 9,3-meter P-top design to the ProZero series.. The low-weight, semi-open design results in a faster workboat that has a larger operational range and extended working time on sea. The P-top features a protective P-top console solution and flexible seating arrangements which can accommodate up to 12 passengers or a full deck cargo.
Article Metal Shark Announces New 55-Foot Pilot Boat Now Under Construction
by Marine-Pilots.com - published on 29 April 2020
Shipbuilder Metal Shark is building a welded aluminum 55’ x 17’ pilot boat for the Pascagoula Bar Pilots Association in Mississippi.
Designed in-house, the new 55 Defiant Pilot being built for Pascagoula Pilots represents the latest evolution in Metal Shark’s pilot boat lineup. The distinctive vessel incorporates the“faceted hull” design initially developed by Metal Shark for the US Navy 40 PB program, and features an enhanced version of Metal Shark’s signature “pillarless glass” in a two-tiered, reverse-raked arrangement.
Opinion Anti-Entrapment Pilot Boat
by Captain Francesco Aiello - Honorary Member Fedepiloti ROMA, Italy - published on 21 April 2020
Article ‘SANAAG’ A new Pilot boat for the Port of Berbera, Somaliland in Africa delivered by Safehaven Marine.
by Safehaven Marine - published on 20 April 2020
Safehaven Marine based in Ireland have just delivered a pilot vessel for operations at the Port of Berbera in
Somaliland, Africa. ‘Sanaag’ is one of Safehaven’s Interceptor 38 pilot vessels, at 11.9m LOA, a very capable design which proves economical to operate, yet capable of dealing with very rough seas and challenging boarding conditions when required.
Article Cromarty Firth Port Authority (CFPA) is seeking for new pilot boats
by Marine-Pilots.com - published on 17 April 2020
Cromarty Firth Port Authority (CFPA) is seeking a contractor to build and deliver a new pilot vessel as part of a major project to upgrade its fleet of vessels. The contract for the work is currently being put out to tender and interested parties are encouraged to apply before the deadline of 8 May, 17.00.