Join and sail through your digital transformation!
Full agenda and speaker list coming soon.
On October 11, 2018, the Kristin Alexis was performing fleeting work with a crew of six, including a captain, pilot, and four deckhands (two per shift), at the Cooper Consolidated fleeting facility at Convent located at mile 161.5. About 2300, the Cooper Consolidated dispatcher informed the Kristin Alexis captain that their next job was to move the derrick-type crane barge Mr Ervin upriver to the Cooper Consolidated fleeting facility in Darrow, located at mile 175.
In this video we follow along with Capt. Dane of the Palm Beach Harbor Pilots Association on a windy Saturday morning as he brings in a massive bulk carrier cargo ship into the Port of Palm Beach. This vessel which has a draft of 27 ft, and a beam of 99 ft is the maximum allowable size vessel allowed to transit into the port due to the shoaling going on that forces all vessel to have a maximum operating draft of 29 ft. No room for error. Also featured in this video is a regular cargo vessel...
This video shows an introduction on the Spiral-Test-Manoeuvre and describes the procedure how to steer through this manoeuvre and measure the data needed. The results will be displayed in a characteristic diagram allowing to identify stable and unstable conditions and related, detailed information, e.g. spiral loop width and height, rudder angle of neutral effect. Samples of stable and unstable ship behaviour demonstrations will be shown by Fast Time Simulation using the SAMMON Planning tool.