Join and sail through your digital transformation!
Full agenda and speaker list coming soon.
This lady came into port in an excellent day, however when I inspected the pilot ladder prior to board I saw that it was rigged using D-Shackles fastened between the side ropes, transferring all the weight and load of the ladder to the clamps and chokes. Truly an unsuitable method of securing the ladder. Retrieval line was also not above the first spreader
After pulling out the pilot boat, the ship was contacted by VHF and the captain was asked to instruct the crew in the usage of ropes and...
On October 11, 2018, the Kristin Alexis was performing fleeting work with a crew of six, including a captain, pilot, and four deckhands (two per shift), at the Cooper Consolidated fleeting facility at Convent located at mile 161.5. About 2300, the Cooper Consolidated dispatcher informed the Kristin Alexis captain that their next job was to move the derrick-type crane barge Mr Ervin upriver to the Cooper Consolidated fleeting facility in Darrow, located at mile 175.