Article GPS (Part 1) - Structure, mode of operation, technical and physical fundamentals of GPS
by Capt. Gunter Schütze, Thailand/Germany - published on 30 January 2020
Article GPS (Part 2), physical and technical errors of GNSS - an error analysis
by Capt. Gunter Schütze, Thailand/Germany - published on 26 February 2020
In my announced sequel, the second part of GPS, it is primarily about the technical and physical operational and functional limitations to which GPS is subject. These limitations, in part, have serious implications for the accuracy of GPS, and even go as far as limiting the functionality of GPS in its functions or even making it impossible. In doing so,
Article GPS (Part 3) - Accidental interferences and intended Interferences by extern technical sytems
by Capt. Gunter Schütze, Thailand/Germany - published on 6 May 2020
Opinion A Corrected Version on Positioning of Pivot Point
by Capt. Santosha K. Nayak - published on 18 November 2020
Understanding the fundamentals of the pivot point is highly required for understanding the alteration of the courses. Pivot point is an imaginary point on the vessel which turns on a circular path on the perimeter of vessel’s turning circle when the vessel makes a turn. The knowledge about the position of the pivot point in a manoeuvring situation provides the ship handler with the information on the geometry of motion of the ship.
Video Harbor Pilots SRL Career Day
published on 31 January 2021
Video OMC International DUKC® - Port of Melbourne
published on 14 October 2019
Article First Pilot Station Steers a Course for Seably Online Maritime Training
published on 5 November 2021
Video How AIS Works - Operation of AIS
published on 25 July 2019
Video Oversized Kasko through Kiel Canal by NAUTITEC / KOTUG / BIJMA
published on 29 July 2020
Going Beyond Borders. The first oversized Kasko (120m x 40m) passed the Holtenau locks at Kiel on her way from the Neptun shipyard in Rostock to Meyer shipyard in Papenburg.
The planning and simulation study on this towage has been performed by NAUTITEC and KOTUG, with the great assistance of pilots and Kiel canal authorities on behalf of Meyer shipyard.
Produced by AVE-Solutions in order of Nautitec, Kotug and Bijma Sleepdiensten.