Visit https://www.maritimetraining.com/Course/Pilot-Ladders-Safe-Rigging-Procedures to purchase the full-length version.
Visit https://www.maritimetraining.com/Course/Pilot-Ladders-Safe-Rigging-Procedures to purchase the full-length version.
Video Aberdeen Harbour - Meet Finn Froekjaer-Jensen, Pilot
published on 26 August 2020
Video Man Overboard Rescue Drills. Ride along with the Pacific Pilotage Authority
published on 13 August 2021
Today i tagged along on the pilot boat Pacific Pathfinder and her sister ship the Pacific Chinook to film their annual Man Overboard drills and re certification. It was a pleasure to watch the crews working together to demonstrate how fast they can save a life. Filmed using a DJI Mini 2 If you are interested in purchasing a Mini here is a link to my DJI affiliate program. https://click.dji.com/AFpMBjgnYfRjCViNU2HZ_g?pm=link All video footage is owned by Northcoast Drone and it can be...
Article Dissertation: Reducing the subjective impact in maritime simulator assessment (2020)
published on 14 October 2021
Video Maritime Pilot Training III - Man overboard manoeuvre
published on 12 May 2021
Article Enhancing Pilot Ladder Safety: The Role of New SOLAS Regulations
by Herman Broers - published on 8 January 2025
Video Bow thruster effect on ship's headway 1
by Capt. Hugues Cauvier - published on 14 July 2022
Video Maritime Pilot Training V - Pilot Ladder Training
published on 12 May 2021
Article Premiere of KARCO new release - Pilot Ladder - A Persisting Challenge
published on 18 June 2021
Article BC Pilotage Authority adds 20m Pilot Boat to fleet
published on 5 November 2021
Article National Transportation Safety Board Releases Report Detailing 2018 Allision At Louisiana’s Sunshine Bridge
published on 13 August 2020
On October 11, 2018, the Kristin Alexis was performing fleeting work with a crew of six, including a captain, pilot, and four deckhands (two per shift), at the Cooper Consolidated fleeting facility at Convent located at mile 161.5. About 2300, the Cooper Consolidated dispatcher informed the Kristin Alexis captain that their next job was to move the derrick-type crane barge Mr Ervin upriver to the Cooper Consolidated fleeting facility in Darrow, located at mile 175.