To learn more visit: https://port-xchange.com/pilottracker/
To learn more visit: https://port-xchange.com/pilottracker/
Video Safety by Finnpilot Pilotage Oy
published on 17 December 2019
Video Conventional vs. Automated Mooring Of Cargo Ships
published on 26 January 2021
Opinion How OpenBridge seeks to improve maritime workplaces
by Prof. Kjetil Nordby Institute of Design - The Oslo School of Architecture and Design - published on 6 May 2020
Lack of standard user interfaces across bridge equipment is a major concern for maritime safety. Pilots are in a unique position, as they are constantly exposed to new and differing bridge working environments, equipment, interface designs and combinations of systems. As pilots face this problem throughout every shift they need to put in considerable effort to adjust their work to the many user interfaces they meet.
Article 3DPortGuard Docking Aid
published on 24 August 2021
Australian technology provider Frontier Automation has released a new vessel tracking system that can be used as a docking aid tool by pilots. As for all Frontier Automation control systems, it uses 3D machine vision to automatically detect and track in real time shipping vessels within range of a berth by providing information on critical distances to mooring infrastructure, on vessel speed and angle, and on vessel movement directions and orientations.
Video TRENZ Pilot Plug - Wärtsilä Pilot PRO
published on 5 July 2019
Article IMPA open letter - Crew exchange in times of corona
by Marine-Pilots.com - published on 4 July 2020
Video Pilot Ladder on Ships- Correct rigging procedure 2020
published on 8 January 2021
Correct method of rigging pilot ladder explained.
As explained, a large number of reports related to the use of pilot ladders which are too long relative to the vessel’s draughts. As a result, the excessively long ladders require shortening up before being deployed for boarding pilots. In these cases, ship crew shortens the pilot ladders, using D-shackles to choke the side ropes at the required height along the ladder’s length. In this method, the D-shackle is first secured to a hard point...